Warehouse Relocation Services in Draper, UT
Warehouse relocation in Draper should begin with the rack you already own and the picking work it must support next. For e-commerce fulfillment and last-mile delivery operations near Draper Industrial Park, moving steel without reconsidering pick faces can carry yesterday's congestion into another building. We inventory existing uprights, beams, decking and accessories, then establish what can be dismantled, shipped and reinstalled within a new layout.
Your move can combine retained components with new replacements and matched additions instead of treating every bay as a separate purchase. As a division of Warehouse Equipment & Supplies Co., supplying and installing since 1997, we coordinate the rack scope around your operating priorities. Experienced installation crews are scheduled and managed for teardown and reassembly, with phased shipping organized around the sections your team is ready to release.
Rack relocation planned around changing pick demand
Start by separating the current rack inventory from the arrangement shown on an old drawing. Record component dimensions, available identification, beam connections and visible condition. That information helps determine which owned materials belong in the receiving building and which require further review before they enter a shipment.
A new drawing places retained bays around pallet sizes, replenishment movements and picking activity. Draper fulfillment operations growing into multiple shifts may need different pick-face locations rather than a copy of the previous arrangement. Discuss which products remain accessible during each phase before deciding the order of dismantling.
Inspection also establishes the replacement list. Damaged parts are removed from the reuse scope and replaced with new components, not repaired for another installation. Where additional positions are needed, matched additions are selected against the identified rack system and intended loads rather than appearance alone.


Plan the move around Draper picking patterns
For consumer goods storage near Sunnyside or Draper Industrial Park, connect rack release decisions to actual picking activity. A useful move plan identifies where retained steel will go, how replacement parts join it and which inventory groups follow each completed installation area.
Four controls for phased warehouse relocation
Identify each released area
Mark the bays that operations can empty and assign their components to a destination zone. Keeping the teardown list tied to the new drawing helps prevent usable beams and frames from becoming an untraceable pile during the move.
Separate inspected materials
Distinguish accepted rack from damaged or unresolved pieces before loading. New replacements should appear on the same material schedule as retained components so an installation phase does not depend on steel that was already rejected.
Ship by assembly need
Group frames, beams and supporting pieces according to the receiving sequence. Phased shipping should support complete areas of rack, with clear identification that lets the receiving team distinguish the next installation group from later material.
Manage installation handoffs
Coordinate crew access with unloaded work areas and incoming rack shipments. The reinstallation sequence should reflect which zones can be assembled and checked before inventory returns, while keeping unresolved component questions visible to the project team.
Pallet rack relocation with room for matched additions
The 12300 South corridor and Bangerter Highway provide useful reference points when discussing origin and destination access. For retail distribution, the practical question is which storage sections must move together so replenishment stock does not arrive ahead of its assigned rack.
Confirm additions while the retained inventory is being reviewed. Extra beams, replacement frames or another run can change shipment grouping and the new drawing. Recording those decisions before dismantling gives the crew a defined assembly scope rather than a collection of field assumptions.
Close each phase by comparing installed bays with the drawing and recording substitutions or outstanding items. Your team should know which sections are ready for its loading process, which materials were replaced and whether later shipments contain remaining owned rack or newly supplied additions.
Recent Installations
Racking projects completed for warehouses across the Salt Lake City metro and Wasatch Front.










Bring your existing rack into the conversation
Send photographs, rack counts and the receiving building dimensions. We can define a teardown and reinstallation scope that distinguishes owned materials, new replacement parts and additions before you approve the move. (801) 942-0493.
Salt Lake Pallet Rack
3556 S 5600 W
Suite #1-1293
Salt Lake City, UT 84120
(801) 942-0493Monday - Friday: 8:00 AM - 6:00 PM
Draper warehouse relocation questions for shift-based picking
Other Storage Services in Draper

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Forklift access inside deep storage lanes for bulk inventory, with fewer access aisles.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers the Salt Lake City metro and Wasatch Front, so one team can handle multiple buildings for the same company.
Where We Work
Located in Salt Lake City, we serve the entire Salt Lake metro and Wasatch Front with industrial pallet racks and warehouse storage solutions.
Salt Lake Pallet Rack
Address
3556 S 5600 W
Suite #1-1293
Salt Lake City, UT 84120
Phone
(801) 942-0493Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Warehouse Relocation in Draper?
Call (801) 942-0493 or request a quote and we will get a layout started.